Monday, April 18, 2005

Bedroom Renovation - Day 2


Day 2 ends with insulation up. Not quite all of it as I had to redo the electrical so that the boxes were actually attached to the studs and drywall rings installed. It's amazing how much quieter the room is with the windows closed.

No comments: